In the 2017 edition of NFPA 25, Chapter 8 (Fire Pumps), there was a significant change from the previous editions of the evaluation of Fire Pump Test Results.
In the 2014 and previous editions, the Pump Evaluation (pass/fail) was determined at the 100% flow rate with a degradation of no more than 95 percent. In the 2017 through current editions, the Evaluation criteria (pass/fail) now require review at EACH required flow point.
Evaluations of: Churn, Rated and Overload, shall be evaluated for no less than 95 percent of flow rates and pressure at each point for either Original unadjusted field test curve, or the Fire pump nameplate. See section 8.3.7.2 of the 2017 NFPA 25, with more explanatory material in the 2017 NFPA 25 Handbook.

As commercial service contractor, you must manage a perpetually fluctuating volume of work orders. A slow week is followed by a weekend full of repair requests. A big project lands on your plate, spreading your resources thin. A heat wave or polar blast initiates an early start to your busy season. Meeting the demands of […]
If you’re feeling pressure to switch software, especially to a system you didn’t choose, you’re not alone. Recent acquisitions in the field service management world have left many contractors scrambling, facing tight migration deadlines and major disruptions to their operations. Forced to Change? You’re Not Alone. We’ve heard from many contractors who are frustrated by […]