AI-powered field service management for commercial contractors—maximize technician performance, streamline operations, and deliver digital-first customer experiences.

Manage parts purchasing and inventory across trucks and warehouses—connect parts to jobs so techs have what they need and billing stays accurate and on time.

Unified mobile inspections that streamline inspection workflows, generate compliance-ready reports, and turn findings into actionable deficiencies and repairs.

Purpose-built estimating and proposal automation for commercial service contractors—quote faster, standardize pricing, and connect cleanly from sale to service.

ServiceTrade AI

ServiceTrade AI helps field and office teams work faster by turning job data into insights opportunities, spotting issues early, and automating next steps.

Integrations

ServiceTrade Integrations connect your ERP, accounting, and other tools to reduce double entry, speed up billing, and keep data consistent across field and office teams.

Jack’s code corner April 2024: NFPA 4

Jack's Code Corner graphic

Jump to section

Do you perform Fire and Life Safety inspections, testing, and maintenance in facilities that are either classified as high-rise buildings or have smoke control systems installed? If so, you may need to begin preparing your end customer for the required NFPA 4 Integrated Fire Protection and Life Safety Testing. 

The intent of an NFPA 4 inspection is to ensure that all interconnected fire and life safety systems continue to function as designed and are certified in a “whole building” life safety concept. 

For example, the IFC 2021 requires NFPA 4 testing to be completed every 10 years after the facility has been occupied. See the excerpt below for further information: 

901.6.2 integrated testing

Where two or more fire protection or life safety systems are interconnected, the intended response of subordinate fire protection and life safety systems shall be verified when required testing of the initiating system is conducted. In addition, integrated testing shall be performed in accordance with Sections 901.6.2.1 and 901.6.2.2.

901.6.2.1 high-rise buildings

For high-rise buildings, integrated testing shall comply with NFPA 4, with an integrated test performed prior to issuance of the certificate of occupancy and at intervals not exceeding 10 years, unless otherwise specified by an integrated system test plan prepared in accordance with NFPA 4. If an equipment failure is detected during integrated testing, a repeat of the integrated test shall not be required, except as necessary to verify operation of fire protection or life safety functions that are initiated by equipment that was repaired or replaced.

901.6.2.2 smoke control systems

Where a fire alarm system is integrated with a smoke control system as outlined in Section 909, integrated testing shall comply with NFPA 4, with an integrated test performed prior to issuance of the certificate of occupancy and at intervals not exceeding 10 years, unless otherwise specified by an integrated system test plan prepared in accordance with NFPA 4. If an equipment failure is detected during integrated testing, a repeat of the integrated test shall not be required, except as necessary to verify operation of fire protection or life safety functions that are initiated by equipment that was repaired or replaced.

The latest

Build your field service management knowledge

Image for Stella Invoice webinar

Get paid faster

Stella Invoice automates invoice assembly from technician notes to help billing teams get paid faster.

Smart Receipts turns a photo of a supply house receipt into a draft purchase order in PartsManager, already matched to...

Why proposals get lost before the conversation startsLearn how to build a sales proposal that wins: capture site data once,...